top of page

Projects Reference

Project name
Fluid
Delivery time
E
P
C
Construction of green Energy Infrastructure for the Suez Canal
LNG
Ongoing
●
●
●
Ammonia Cracking Test Facility
LNH3
Ongoing
●
●
●
Construction ME-GI DF Engine Test Facilities #1
LNG
Ongoing
●
●
●
Construction ME-GI DF Engine Test Facilities #2
LNG
Ongoing
●
●
●
Construction of Ammonia Test Equipment
LNH3
Ongoing
●
Low-carbon Fuel Storage and Supply System(LPG, LNH3)
ETC
2026.09
●
●
Cryogenic Pump Test Bed – Supervision
LNG
2026.01
●
Cryogenic Pump Test Bed – Detailed Design
LNG
2026.01
●
Ammonia Cracking Test Facility – Engineering Service
LNH3
2025.09
●
ASU Plant – Detailed Design (Electrical, Instrument, P&ID)
ETC
2025.07
●
Engineering of Maritime Ammonia Fuel Supply System
LNH3
2025.06
●
Ammonia Fuel Supply System (LFSS) for Research Facility
LNH3
2024.12
●
●
LNG Storage & Supply System Reinforcement
LNG
2024.12
●
●
●
Ammonia Gas Supply System Construction
LNH3
2024.12
●
●
Construction of Ship Waste Heat Demonstration Facility
ETC
2024.05
●
●
●
Ammonia Fuel Supply System (Gas Phase Supply Device)
LNH3
2024.03
●
●
●
Ammonia Fuel Storage System
LNH3
2023.10
●
●
●
Ammonia Fuel Supply System
LNH3
2023.10
●
●
●
Alternative Fuel Propulsion System – Detailed Design
LNH3
2023.06
●
Ship Waste Heat Power Generation Test Facility
ETC
2023.05
●
Liquefied Hydrogen Storage Container
LH2
2023.03
●
LNG Fuel Gas Supply System for Oceanographic Survey Ship
LNG
2023.02
●
●
●
Ammonia Fuel Supply System Facility Improvement
LNH3
2023.01
●
LCO2 Injection Pump Test Bed – Detailed Design
LCO2
2022.12
●
Ammonia Civil & Utility System FEED
LNH3
2022.11
●
LNG Supply System & Engine Auxiliary Devices Installation
LNG
2022.06
●
●
●
Hydrogen & LNG Mixed Combustion Engine Test Facility
ETC
2022.05
●
●
●
HP Pump Test Facility
LNG
2021.08
●
●
●
LPG Supply Facility – Construction
LPG
2020.09
●
●
●
Natural Gas & Petroleum Gas Mixed Combustion Test Facility
ETC
2020.06
●
●
●
LPG Supply Facility – Engineering & Manufacturing
LPG
2020.05
●
●
LNG Supply Facility (DF Engine LNG Test Bed)
LNG
2019.12
●
●
●
LNG Facility Reinforcement (HP LNG Test Bed)
LNG
2019.09
●
●
●

Head office

​

WBC the PALACE 102/1401 28, Centum1-ro, Haeundae-gu, Busan, Korea

E-Mail: enco@enco-energy.co.kr  /  TEL: +82-51-925-1235

Copyright © E&CO. All Rights Reserved.
bottom of page