top of page
Gas Power Plant
LNG ISO
Tank
Container
LNG Storage Equipment
LNG Supply Plant
Regasification System
Gas Power Plant
LNG ISO
Tank
Container
LNG Storage Equipment
LNG Supply Plant
Regasification System
Home
About
CEO Greeting
Mission, Vision
Organization
Certification
Business
Project Consulting
Engineering
Fuel Gas Supply System
ISO Tank Container
Test Bed Facility
Hyper Cryogenic
Vacuum Pipe
News
Activity
Contact
[Ammonia storage and fuel supply system] Completion of basic and detailed engineering for research facility equipment
In July 2023, E&CO LTD. successfully completed a basic and detailed engineering contract for an ammonia storage and fuel supply system,...
okenco2017
5 days ago
2 min read
Completion commissioning of reinforced LNG fuel storage and supply system
In December 2024, E&CO LTD. successfully completed the reinforcement and commissioning of the LNG fuel storage and supply system at a...
okenco2017
Jun 20
2 min read
E&CO LTD. completes supply and commissioning of ammonia gas fuel supply system
In July 2024, E&CO LTD. successfully completed the supply and commissioning of the ammonia gas fuel supply system under contract with the...
okenco2017
Jun 12
1 min read
E&CO LTD. successfully delivers EPC contract for liquid ammonia fuel storage and supply system
In October 2023, E&CO LTD. successfully completed the delivery of two EPC (Engineering, Procurement, and Commissioning) contracts with...
okenco2017
Jun 10
1 min read
E&CO LTD. completes engineering design and technical review for ammonia facility and liquefied ammonia system
In December 2023, E&CO LTD. successfully completed two engineering contracts with A research institute based in Daejeon: a design service...
okenco2017
Jun 4
2 min read
bottom of page