top of page


E&CO Co., Ltd. Advances Development of Korea’s First Liquid Hydrogen(LH2) ISO Tank Container
E&CO Co., Ltd. is currently developing Korea’s first 40ft ISO tank container capable of storing, transporting, and supplying liquid hydrogen (LH₂), as part of a national R&D initiative selected under the “Export-Oriented Strategic Task” of the Ministry of SMEs and Startups. This R&D project applies E&CO’s proprietary technologies to ensure tight sealing and insulation in ultra-cryogenic conditions (-253°C), including its previously developed Multi-Layer Insulation (MLI) jig
okenco2017
May 12, 20252 min read


Promoting Eco-Friendly Marine Technology: E&CO Co., Ltd. Leads Test Facility design and construct
In February 2023, E&CO Co., Ltd. was successfully completed an engineering service project constructed by the Korea Research Institute of Ships and Ocean Engineering (KRISO) for the establishment of a performance test facility for marine waste heat recovery systems. The objective of this project was to design a full-scale demonstration infrastructure for waste heat recovery power systems, in line with KRISO's conceptual design, to support the development of eco-friendly mar
okenco2017
May 7, 20252 min read
![[Suez Canal Green Energy Infrastructure Development Project] Korea and Egypt expand Joint Efforts](https://static.wixstatic.com/media/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.webp)
![[Suez Canal Green Energy Infrastructure Development Project] Korea and Egypt expand Joint Efforts](https://static.wixstatic.com/media/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.webp)
[Suez Canal Green Energy Infrastructure Development Project] Korea and Egypt expand Joint Efforts
On June 24, 2024, A meeting is held in the National Korea Maritime & Ocean University with the Suez Canal Authority of Egypt to discuss mutual cooperation for the "Suez Canal Green Energy Infrastructure Development Project." The consultation was attended by President Ryoo Dong-geun(KOMU), Chairman Osama Rabie of the Suez Canal Authority, Byung-geun Song, CEO of E&CO Co., Ltd., and other key representatives from institutions. Also during the discussions, the two institutions e
okenco2017
Apr 29, 20251 min read
![[Ammonia Fuel Storage and Supply Facility] ‘World's First’ High Pressure Ammonia R&D Engine and Safety Technology Demonstration](https://static.wixstatic.com/media/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.webp)
![[Ammonia Fuel Storage and Supply Facility] ‘World's First’ High Pressure Ammonia R&D Engine and Safety Technology Demonstration](https://static.wixstatic.com/media/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.webp)
[Ammonia Fuel Storage and Supply Facility] ‘World's First’ High Pressure Ammonia R&D Engine and Safety Technology Demonstration
The demonstration of the safety technology and R&D in high pressure ammonia for the first time in the world held in KOREAN REGISTER Green Ship Test & Certification Center (Gunsan-si, Jeonbuk-do) on June 11, 2024. This demonstration in charge of KOREAN REGISTER attended HD Korea Shipbuilding & Offshore Engineering, HD, HD HYUNDAI HEAVY INDUSTRIES CO., LTD. and Korea Research Institute of Ships and Ocean Plants. The operating of ammonia fuel storage & supply system was conducte
okenco2017
Apr 23, 20251 min read
![[Completed Patent registration] System for reliquefying LNG Boil-Off Gas using hydrogen Boil-Off Gas](https://static.wixstatic.com/media/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.webp)
![[Completed Patent registration] System for reliquefying LNG Boil-Off Gas using hydrogen Boil-Off Gas](https://static.wixstatic.com/media/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.webp)
[Completed Patent registration] System for reliquefying LNG Boil-Off Gas using hydrogen Boil-Off Gas
E&CO Co., Ltd. has completed the patent registration entitled “System for reliquefying LNG Boil Off Gas using hydrogen Boil-Off Gas” on June 3, 2024. The principle of the invention is to reliquefy NG BOG from LNG fuel tank to utilize hydrogen (H2) BOG(Boil-Off Gas). As a result, not only reduce occupied space due to not installation on a device for reliquefying but it is able to build a system that minimized energy consumption and operating costs. 2024년 6월 3일 주식회사 이앤코가 액화수소 탱
okenco2017
Apr 21, 20251 min read
![[Completed Patent registration] Self-powered regasification system](https://static.wixstatic.com/media/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.png/v1/fill/w_333,h_250,fp_0.50_0.50,q_35,blur_30,enc_avif,quality_auto/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.webp)
![[Completed Patent registration] Self-powered regasification system](https://static.wixstatic.com/media/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.png/v1/fill/w_344,h_258,fp_0.50_0.50,q_95,enc_avif,quality_auto/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.webp)
[Completed Patent registration] Self-powered regasification system
E&CO Co., Ltd. has successfully completed the patent registration entitled “Self-powered regasification system” on July 3, 2023. This invention was developed to go beyond the limit of LNG regasification facilities at the existing onshore terminals to regasify LNG at offshore and supply natural gas to onshore terminals that can be applicable to FSRB(Floating Storage and Regasification Barge). it can be minimized additional electricity usage that compared to before the inventio
okenco2017
Apr 4, 20251 min read


Development of Marine LNG Multi-Bunkering Module
2023년 7월 3일 해양수산부 주관과제 “효율적인 LNG 적하역을 위한 해상용 LNG 멀티 벙커링 모듈 개발”를 성공적으로 마무리 하였다. 연구과제 주요 내용인 멀티 벙커링 모듈, 멀티 벙커링 Structure, 멀티 벙커링 모듈 모니터링...
okenco2017
Apr 2, 20251 min read
bottom of page



