top of page


E&CO Co., Ltd. Mutual Cooperation Ceremony with the Suez Canal Authority
On July 1, 2025, E&CO Co., Ltd. held a ceremony at the SCA Training Center in Port Said, Egypt, together with the Suez Canal Authority...
okenco2017
Sep 301 min read


Participation in the 2025 Everllence Industries Forum
E&CO LTD. participated in the 2025 Everllence Industries Forum held from September 4 to 5, 2025, at the F Hotel in Songdo, Busan, upon...
okenco2017
Sep 122 min read
![[Completion on the Air Separation Unit (ASU) design] The Basic and Detailed Engineering for Industrial Gas Storage Facility in Yeongilman, Pohang](https://static.wixstatic.com/media/fa4da5_f28aec80e23a4d45b4b83ccf03415ad3~mv2.png/v1/fill/w_333,h_250,fp_0.50_0.50,q_35,blur_30,enc_avif,quality_auto/fa4da5_f28aec80e23a4d45b4b83ccf03415ad3~mv2.webp)
![[Completion on the Air Separation Unit (ASU) design] The Basic and Detailed Engineering for Industrial Gas Storage Facility in Yeongilman, Pohang](https://static.wixstatic.com/media/fa4da5_f28aec80e23a4d45b4b83ccf03415ad3~mv2.png/v1/fill/w_344,h_258,fp_0.50_0.50,q_95,enc_avif,quality_auto/fa4da5_f28aec80e23a4d45b4b83ccf03415ad3~mv2.webp)
[Completion on the Air Separation Unit (ASU) design] The Basic and Detailed Engineering for Industrial Gas Storage Facility in Yeongilman, Pohang
E&CO LTD. has successfully completed the basic and detailed engineering services for an industrial gas storage facility located in the...
okenco2017
Aug 262 min read
![[INAMARINE 2025] Exhibition on ISO Tank Container and Lashing Bridge](https://static.wixstatic.com/media/fa4da5_bedd435f8ef042048f1112036f4a770e~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_bedd435f8ef042048f1112036f4a770e~mv2.webp)
![[INAMARINE 2025] Exhibition on ISO Tank Container and Lashing Bridge](https://static.wixstatic.com/media/fa4da5_bedd435f8ef042048f1112036f4a770e~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_bedd435f8ef042048f1112036f4a770e~mv2.webp)
[INAMARINE 2025] Exhibition on ISO Tank Container and Lashing Bridge
E&CO LTD. participated in the INAMARINE 2025 exhibition held from July 29 to 31, 2025, at JI Expo Kemayoran in Jakarta, Indonesia. As...
okenco2017
Aug 73 min read
![[Ammonia storage and fuel supply system] Ammonia research facility construction and commissioning completed](https://static.wixstatic.com/media/fa4da5_6eb5bdf2b99f458fa9dec13289293d21~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_6eb5bdf2b99f458fa9dec13289293d21~mv2.webp)
![[Ammonia storage and fuel supply system] Ammonia research facility construction and commissioning completed](https://static.wixstatic.com/media/fa4da5_6eb5bdf2b99f458fa9dec13289293d21~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_6eb5bdf2b99f458fa9dec13289293d21~mv2.webp)
[Ammonia storage and fuel supply system] Ammonia research facility construction and commissioning completed
In October 2024, E&CO LTD. successfully delivered and commissioned ammonia research facility for the Fire Insurers Laboratories of Korea...
okenco2017
Jul 152 min read
![[Ammonia storage and fuel supply system] Completion of basic and detailed engineering for research facility equipment](https://static.wixstatic.com/media/fa4da5_e7f0e91d0b444c408402ec781f9ae3fb~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_e7f0e91d0b444c408402ec781f9ae3fb~mv2.webp)
![[Ammonia storage and fuel supply system] Completion of basic and detailed engineering for research facility equipment](https://static.wixstatic.com/media/fa4da5_e7f0e91d0b444c408402ec781f9ae3fb~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_e7f0e91d0b444c408402ec781f9ae3fb~mv2.webp)
[Ammonia storage and fuel supply system] Completion of basic and detailed engineering for research facility equipment
In July 2023, E&CO LTD. successfully completed a basic and detailed engineering contract for an ammonia storage and fuel supply system,...
okenco2017
Jun 272 min read


Completion commissioning of reinforced LNG fuel storage and supply system
In December 2024, E&CO LTD. successfully completed the reinforcement and commissioning of the LNG fuel storage and supply system at a...
okenco2017
Jun 202 min read


E&CO LTD. completes supply and commissioning of ammonia gas fuel supply system
In July 2024, E&CO LTD. successfully completed the supply and commissioning of the ammonia gas fuel supply system under contract with the...
okenco2017
Jun 121 min read


E&CO LTD. successfully delivers EPC contract for liquid ammonia fuel storage and supply system
In October 2023, E&CO LTD. successfully completed the delivery of two EPC (Engineering, Procurement, and Commissioning) contracts with...
okenco2017
Jun 101 min read


E&CO LTD. completes engineering design and technical review for ammonia facility and liquefied ammonia system
In December 2023, E&CO LTD. successfully completed two engineering contracts with A research institute based in Daejeon: a design service...
okenco2017
Jun 42 min read


E&CO LTD. developed a safety operation procedure for hydrogen ships
In connection with the hydrogen bunkering research project led by the Korean Register (KR), the safety operation procedures for...
okenco2017
May 201 min read


E&CO LTD. Advances Development of Korea’s First Liquid Hydrogen(LH2) ISO Tank Container
E&CO LTD. is currently developing Korea’s first 40ft ISO tank container capable of storing, transporting, and supplying liquid hydrogen...
okenco2017
May 122 min read


Promoting Eco-Friendly Marine Technology: E&CO LTD. Leads Test Facility design and construct
In February 2023, E&CO LTD. was successfully completed an engineering service project constructed by the Korea Research Institute of...
okenco2017
May 72 min read
![[Suez Canal Green Energy Infrastructure Development Project] Korea and Egypt expand Joint Efforts](https://static.wixstatic.com/media/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.webp)
![[Suez Canal Green Energy Infrastructure Development Project] Korea and Egypt expand Joint Efforts](https://static.wixstatic.com/media/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_671f08cf269842df9ce5c76117b74500~mv2.webp)
[Suez Canal Green Energy Infrastructure Development Project] Korea and Egypt expand Joint Efforts
On June 24, 2024, A meeting is held in the National Korea Maritime & Ocean University with the Suez Canal Authority of Egypt to discuss...
okenco2017
Apr 291 min read
![[Ammonia Fuel Storage and Supply Facility] ‘World's First’ High Pressure Ammonia R&D Engine and Safety Technology Demonstration](https://static.wixstatic.com/media/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.webp)
![[Ammonia Fuel Storage and Supply Facility] ‘World's First’ High Pressure Ammonia R&D Engine and Safety Technology Demonstration](https://static.wixstatic.com/media/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_a96a812f259247feb68f5dfacc653522~mv2.webp)
[Ammonia Fuel Storage and Supply Facility] ‘World's First’ High Pressure Ammonia R&D Engine and Safety Technology Demonstration
The demonstration of the safety technology and R&D in high pressure ammonia for the first time in the world held in KOREAN REGISTER Green...
okenco2017
Apr 231 min read
![[Completed Patent registration] System for reliquefying LNG Boil-Off Gas using hydrogen Boil-Off Gas](https://static.wixstatic.com/media/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.jpg/v1/fill/w_333,h_250,fp_0.50_0.50,q_30,blur_30,enc_avif,quality_auto/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.webp)
![[Completed Patent registration] System for reliquefying LNG Boil-Off Gas using hydrogen Boil-Off Gas](https://static.wixstatic.com/media/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.jpg/v1/fill/w_344,h_258,fp_0.50_0.50,q_90,enc_avif,quality_auto/fa4da5_0d83f53bc9134ec094175b7105f14c5c~mv2.webp)
[Completed Patent registration] System for reliquefying LNG Boil-Off Gas using hydrogen Boil-Off Gas
E&CO LTD. has completed the patent registration entitled “System for reliquefying LNG Boil Off Gas using hydrogen Boil-Off Gas” on June...
okenco2017
Apr 211 min read
![[Completed Patent registration] Self-powered regasification system](https://static.wixstatic.com/media/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.png/v1/fill/w_333,h_250,fp_0.50_0.50,q_35,blur_30,enc_avif,quality_auto/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.webp)
![[Completed Patent registration] Self-powered regasification system](https://static.wixstatic.com/media/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.png/v1/fill/w_344,h_258,fp_0.50_0.50,q_95,enc_avif,quality_auto/fa4da5_de7049099f67469db0f58f2093cff5c2~mv2.webp)
[Completed Patent registration] Self-powered regasification system
E&CO LTD. has successfully completed the patent registration entitled “Self-powered regasification system” on July 3, 2023. This...
okenco2017
Apr 41 min read


Development of Marine LNG Multi-Bunkering Module
2023년 7월 3일 해양수산부 주관과제 “효율적인 LNG 적하역을 위한 해상용 LNG 멀티 벙커링 모듈 개발”를 성공적으로 마무리 하였다. 연구과제 주요 내용인 멀티 벙커링 모듈, 멀티 벙커링 Structure, 멀티 벙커링 모듈 모니터링...
okenco2017
Apr 21 min read


E&CO Awarded AIP by KR for concept design of Hydrogen Bunkering Generic Model for GH2 / LH2 / MH
2023년 12월 20일, E&CO R&D 기술연구소에서 개발한 ‘수소 벙커링 3상 (GH2 / LH2 / MH) 표준모델’이 한국선급으로부터 기본 설계의 기술적 적합성을 검증하는 기본승인 (Approval in Principle, AIP)...
okenco2017
Jan 9, 20242 min read


E&CO Awarded Fuel Gas Storage/Supply System of Ammonia from KOREA REGISTER
2022년 09월 07일, E&CO는 한국선급으로부터 암모니아 연료 저장/공급 시스템 구축 프로젝트를 수주하는데 성공했다 . 이번 계약은 연료저장 및 공급시스템 전체에 대한 E.P.C Turn Key Project 로써 내년 4월까지 시운전...
okenco2017
Sep 13, 20221 min read
bottom of page